Customization: | Available |
---|---|
After-sales Service: | From Payment to Delivery, We Guarantee Your Tradi |
Warranty: | One Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Supplier Professional Custom Production Mold Processing Precision Mold Parts/Injection Mold Parts
Senlan are a professional precision die casting mold parts and plastic mould parts manufacturer.We have the ability to manufacture all kind of precision parts, they are commonly used in precision plastic mold, auto mold, medicine mold,Daily Packing Mold.
we are fully equipped with CNC milling,CNC lathe,EDM,W/EDM,OD/ID grinding machines and precise surface grinder etc.we can make the parts with tolerance within +/-0.005mm, axiality within 0.002mm, roundness within 0.002mm, surface roughness within Ra0.6, straightness within 0.002mm.
Material |
1.2344/SKH51/SKH61/SKH11/DAC |
Hardness |
48-52HRC |
Heat treatment |
Available |
Service |
Made-to-order |
Surface treatment |
/ |
Closest tolerance |
+ - 0.01mm |
Polishness |
Ra0.6 |
Axiality |
0.01mm |
Verticality |
0.01mm |
Dongguan Mingshang Mould Parts Co., Ltd is established in 2008, is a professional manufacturer of precision mould parts. Our factory, located in the mould town--Chang'an. It is a professional company in research, development and manufacturing of precision mould components,we have over 10 years experience in this field,our advanced precision equipment and scientific quality control ensures customers satisfaction.
1. Customer's request is our purpose and target.
2. Quick samples delivery service and produce according to your BOM.
3. Professional production team, strictly quality control department, experienced sales department.
4. One-stop solution for our long term customers .
5. Customized size and OEM/ODM service acceptable.
6. 100% inspect before deliver , quality warranty and long term after-service .
7. Competitive price ,Excellent service , Quick delivery , Safety payment , Flexible trade terms.
Why choose us
Main products
1.Core pin,cavity pin,insert pin etc
2.HSS punch ,Precision punch ,Special-shaped punch
3.Ejector pins,ejector sleeve,two-stage ejector pins etc
4.Guide pillars ,Guide bushings ,Guide post set
5.Slide Core Units,Latch locks,locating Series
Mingshnag has strict quality control system from the raw material incoming to finished products outgoing. Our mould parts are guaranteed high precision,high polished and long service life.
Below are our main quality inspection items in the whole production process:
Material incoming: 100% inspection
Rough Finished:100% inspetion
Heat treatment: random inspection
Face grinding: 100% inspection
Center-less cylindrical grinding: 100% inspection
OD/ID grinding: 100% inspection
EDM:100% inspection
Wire-Cutting:100% inspection
Packing: the final 100% inspection before the formal shipment
Package
Coated with anticorrosive oil, packed in carton box
Delivery
Delivery time is usually 7-15 working days for type of ejector pin, specific time is according to quantity.
Shipping
We ship using express such as DHL, UPS, FEDEX etc. or according to customer's requirement . It takes about 3-5 days to arrive your front door, and proof of shippments are provided with a shipping or tracking number. And we ship by occean shippment for larger quantity items, it will be economic for customers.
How can I get your quotation ?
A : Please provide us information as below : 3D Drawing (STEP, IGS, STL) or 2D/images with Dimension,Product Material you are into or suggested by us and Order Quantity.
Q:How do I know about the production?
A:We will double confirm your requirements and send you the sample before the mass production. During the mass production, we will keep you informed of any progress. Besides, we will do 100% quality inspection before shipment.
Q: How do you do the quality control?
A: Quality is the priority. All products with ISO Certificates, and 100% QC inspection before shipment.
Q. Can you produce according to the samples or drawings?
A: Yes, we can produce parts by your samples or technical drawings
Q : How long is the lead time after placing order ?
A : Lead time depends on your quantity.